Each procedure, each part, every single operate in EPG is demanded to be completed a single phase pursuing yet another, very carefully and cautiously, from material variety, reformation to manufacturing add-ons, from parts warmth therapy to computerized assembly, from top quality management to solution inspection and tests and from buy dealing to after product sales services. If you need any information or samples, please speak to us and you will have our before long reply. Great attention has been paid out on environmental protection and strength conserving.
Horizontal CNC Lathe EPTT
For Turning Grinding Vessel Shipyard comma Cylinders comma EPTT Shaft commaEPT Mould comma Railway Parts commaWheel Hub Turbine commaFlange commaetc
1 interval OutstXiHu (West EPT) Dis.Hu (West EPT) Dis. Qualities colon
Our business was estabEPTTd in 1969 as a armed forces EPTTrprise at the starting period of time With far more than fifty a long time knowledge comma Currently we are EPTTized in re-creating and production EPT lathe EPTTs per your EPTT calls for and requests period of time
This series lathe EPTT has turning comma grinding and milling capabilities comma it can be known as CNC machining cEPTTr also time period It can help you preserve time and increase efficiency for the part which needs to be truned comma grinded and milled period of time
1 rpar period of time Have Load as EPT as Attainable colon Internationally forerunner computation systems and optimized finite element evaluation methods are adopted and the chosen supplies are suitable for the design and style period
2 period rpar period of time EPT Rigidity comma Steadiness and EPT Upkeep colon All castings are manufactured of higher-strength meehanite EPTT250 period which is especially suitable for hefty chopping period of time All huge castings stand the check of annealing and vibration ageing and inside pressure is eliminated comma so the general precision is drastically enhanced and processed elements are identified with higher geometric precision period of time
3 period rpar A single-piece composition created of meehanite comma significantly enhXiHu (West EPT) Dis.Hu (West EPT) Dis.ng its abrasion resistance comma and the inner drive elimination approach creates high vibration resistance and noticeably improves balance time period The cross-formed foundation and rectangular bearing construction ensure large structural steadiness and forever stable quality time period
4 period rpar The lathe bed is in fixed heavy slicing framework comma incXiHu (West EPT) Dis.Hu (West EPT) Dis. rectangular difficult rails analyzed by EPT warmth therapy and substantial-precision area grinding lparstraightness in complete stroke lt0 period05mm rpar period
5 period rparTurcite-B is pasted on the sliding area in orEPTTto boost the rail aposs smoothness and wearing resistance period The widened challenging rail design and style can supply required resistance and steadiness for hefty cutting period of time
six time period rpar The headstock comma produced of substantial toughness and higher rigidity keel rib comma is in EPTT cage condition comma and the EPTT incEPTTs class P5 grinding EPTs comma which can give attractive driving precision and increased torque interval
7 period of time rpar Incorporating German AM systems comma the main shaft is produced of chrome-molybdenum alloy and proves substantial precision comma large rigid and attractive deformation resistance soon after tough solfinish machining comma carbonization comma growing older treatment and precision grinding period of time The motor figures high output lpar26kw rpar and the max period rev period is 3000RPM period of time Soon after the principal shaft assembling is accomplished comma the total assembly shall be calibrated by dynamic equilibrium examination period The independent lubrication will additional boost the balance of the headstock in the course of operation time period
8 interval rpar StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd 4 knife library comma mounted on a turret employed in precision turning interval
9 period of time rpar The tailstock is made up of two parts colon the higher one incEPTTs a sleeve moving mechanism comma spindle assembly comma and a shaft cEPTTrline adjustment mechanism comma with a rectangular head in the rear comma which is created to lock the sleeve manually semi and the reduced a single incEPTTs a tailstock fast-moving motor and a locking mechanism comma with the primary shaft put in on the higher-precision radial clearance-adjustable double-row cylindrical roller bearing in the sleeve comma rendering the high-precision rotating top on the tailstock time period Even so comma in orEPTTto fulfill specific EPTT demands of the machining approach comma it is feasible to transfer the plug board from the flange groove in the entrance of the sleeve to the groove around the front finish of the major shaft in orEPTTto resolve the primary shaft and obtain a EPT cEPTTr time period
10 rpar The principal factors are inspected strictly by the CMM to ensure an excellent high quality period of time
Our Theory colon MaXiHu (West EPT) Dis.mize Buyer aposs Profitability unEPTTthe least make investments EPT time period
Software colon This series CNC horizontal lathe can uEPTTze higher-speed metal and carbide cutting instruments to complete tough or complete turning process for not only the non-ferrous metals like numerous composition steels comma casting steels and irons comma but also the exterior solinternal cylindrical sol conical sol spherical surfaces comma thread of non-metallic supplies and all varieties of the surface of curve rotary physique period What aposs far more comma it can also comprehend the consistent velocity reducing line for turning commagrinding and milling the sophisticated components comma which will save fixture clamping time and increases working efficiency for buyers period
two time period EPTnical Parameters
Identify | CG61100 | CG61125 | CG61160 | CG61200 | CG61250 | CG61300 | |
Description | Unit | ||||||
Max time period EPTg More than Mattress | mm | a thousand | 1250 | 1600 | 2000 | 2500 | 3000 |
Max time period EPTg More than the skateboard | mm | 650 | 800 | 1200 | 1650 | 1800 | 2800 |
Max period WeigEPTT of Perform-piece | T | 10 | 15 | twenty | twenty | twenty | forty |
Max interval Size of Function-piece | mm | 3000-12000 | |||||
EPTs of Spindle Velocity | sol | Infinitely Variable Velocity solstep-much less velocity | |||||
Assortment of Spindle Pace | r solMin | 10-300 | 10-200 | ten-a hundred and sixty | 4-80 | four-eighty | 1 period6-63 |
Chuck Diameter | mm | 800 | one thousand | 1250 | 1600 | 2000 | 2500 |
X commaZ-AXiHu (West EPT) Dis.s Feed Assortment | mm solMin | -3000 | |||||
Horizontal Stroke | mm | 500 | 625 | 800 | a thousand | 1250 | one thousand |
EPTTitudinal Stroke | mm | 3000-12000 | |||||
Major Driving EPT | Kw | eleven | 22 | forty five | seventy five | 75 | seventy five |
Cutting Drive lparCarriage rpar | Kn | four | 6 | 20 | 40 | forty | sixty |
Sleeve Diameter of EPTTilstock | mm | one hundred eighty | a hundred and eighty | 290 | 290 | 290 | 480 |
Spindle Diameter of tailstock | mm | one hundred twenty five | a hundred twenty five | a hundred and sixty | a hundred and sixty | 160 | 240 |
Rermarks colon
1 interval The previously mentioned 6 versions of EPT Duty Horizontal Lathe EPTT are the stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd configurations comma we can also layout and manufacture EPT lathe EPTTs according to the person aposs workpiece functions period It can be handbook or CNC control comma equally are accessible interval
two interval This collection large duty horizontal Lathe has been exported to Norway comma TEPTTd comma Romania comma Iran comma Russia comma Chile comma Indonesia for machining railway components comma auto components comma mining and metallurgy comma shipping building comma wind EPTT and other EPTTry market period
3 period Deal and Cargo
Anti-Rust Oil sol Anti-Corrosive Oil for the EPTT EPTT comma then wrapping the protecting film
EPTen Box Package deal comma or vacumm bundle is also accessible according to client aposs EPTT ask for time period
four time period After-sale Services amp Routine maintenance
1 interval We offer expert technical coaching for end users apos operators and upkeep staff to allow them to properly use and function the lathe and carry out typical upkeep period of time
two period of time Guarantee time period colon A single year soon after acceptance of the lathe time period We can also prolong the routine maintenance time per person aposs EPTT needs to two or three years time period
3 period In situation of any top quality problem found in the course of procedure comma the factory will dispatch personnel get there to the consumer aposs place inside 48 hrs lpardomestic consumers rpar amp within three daEPTT lparEPT Customer rpar and the specialized workers won apost go away before resolving the malfuntion time period
four period The organization will freely offer distinct EPT and mechanical parts for the purchased lathe timely in guarantee time period interval
five time period The firm will supply life span guarantee for the consulting services in conditions of application comma servicing comma repair comma renovation comma etc of equipments period
For a lot more specifics comma please really feel free of charge to get in touch with us period Thanks excl